A Balanced Scorecard has been designed in Development client wherein its measures have been linked to BI development client.
When the scorecard is transported to Production client, the measures are no longer linked to BI though BI production client has a replica of the same cubes as those in BI development client. Note that RFCs are different in both cases and have been successfully linked to the two clients. Kindly suggest a way to get these links automatically as the Production client is closed, measures can't be linked directly there.