Dear all,
Did anyone encounter or have similar situation:
We have two different source for one measure: excel and BW. The reason for this is that our client has the data in BW but only from 2014. But, for previous periods there are no data in BW and we need to use excel as a source for a measure.
The problem is dimension that is used for that measure.
The part that is loaded from the excel uses manually created dimension and for the other part (from BW) dimension will come from BW.
How do we combine the data for that dimensions?
We were planning to add up the measure loaded from excel and the measure loaded from BW. But, we are not sure what to do with dimension. Is it possible to do some king of mapping of one dimension element to another?
Thank you in advance.
Best regards,